Files

Download

Download Full Text (6.8 MB)

Description

During 1979 and 1980, soil fertility research was conducted at two locations in the Delta Clearwater area. One of the test sites, Lee F ett’s Farm, was cleared in the mid-1950s and has been in production for about 25 years. The other test site is situated on a tract of newly cleared land owned by Dennis Green. The new lands site was cleared by the traditional berm-pile method during the winter of 1978-79. This method removes much of the moss layer, and in some cases, part o f the topsoil. Land cleared by this procedure is lower in natural fertility, but has the advantage of enabling the farmer to plant a crop the first summer after clearing. In this publication, progress reports are given for several research projects involving fertilizer use and rates of application.

Publication Date

4-17-1981

Handle

http://hdl.handle.net/11122/2439

A SUMMARY OF 1979 and 1980 SOIL FERTILITY RESEARCH IN THE DELTA -CLEARWATER AREA OF ALASKA

Share

COinS